Skip to content
Muhkem İnşaat ve Mühendislik
All projects
SteelAydin

3S Kale Energy Hydroelectric Power Plant – Stair Tower

The steel structural components of the stair tower constructed at the 3S Kale Energy Hydroelectric Power Plant were fabricated in our workshop in accordance with the applicable regulations and technical specifications, including all required welding connections.

At the construction site, the column anchor rods were positioned in accordance with the project drawings. The steel structural components prepared in our workshop were transported to the site and erected in accordance with the approved project. The installation was completed and the structure was successfully handed over.

Proje Türü
Çelik Yapı Sistemleri
Konum
Aydın
Kapasite
18 mt Yükseklik
Yapım Yılı
2026
Metraj
15 ton
İşveren
Yıldırım Çelik Yapı
3S Kale Energy Hydroelectric Power Plant – Stair Tower

Project photos

1 / 3

Let's plan the right solution for your structure together

Talk to our expert team about our services.