3S Kale Energy Hydroelectric Power Plant – Stair Tower
The steel structural components of the stair tower constructed at the 3S Kale Energy Hydroelectric Power Plant were fabricated in our workshop in accordance with the applicable regulations and technical specifications, including all required welding connections.
At the construction site, the column anchor rods were positioned in accordance with the project drawings. The steel structural components prepared in our workshop were transported to the site and erected in accordance with the approved project. The installation was completed and the structure was successfully handed over.
- Proje Türü
- Çelik Yapı Sistemleri
- Konum
- Aydın
- Kapasite
- 18 mt Yükseklik
- Yapım Yılı
- 2026
- Metraj
- 15 ton
- İşveren
- Yıldırım Çelik Yapı